Track Record
| NO. | PROJECT NAME | CLIENT | MAIN CONTRACTOR | PROJECT PERIOD | SCOPE OF WORK |
|---|---|---|---|---|---|
| 1 | Contract CR202 Design and Construction of Bored Tunnel Between Fairways Drive and Sin Ming Walk and Associated Works |
Obayashi | Shanghai Tunnel JV | Jun 2026 – Present | JGP (inclined) |
| 2 | CAG : Changi Airport – Terminal 5 (Megaspine & GTC Interface) |
CAG | Penta Ocean – Koh Bros JV | Mar 2026 – Present | Deep Soil Mixing / Jet Grouting |
| 3 | CAG : Changi Airport – Terminal 5 Substructure (T5A & T5B) |
CAG | CCCC – Obayashi JV | Apr 2025 – Present | Deep Soil Mixing / Jet Grouting / TAM Grouting |
| 4 | MBSG : Marina Bay Sands (IR2) | MBSG | LT Sambo Co., Ltd | Mar 2025 – Present | Deep Soil Mixing / Jet Grouting / TAM Grouting |
| 5 | Contract CR108 Design and Construction of Pasir Ris Interchange Station and Tunnels |
Land Transport Authority (LTA) | Daewoo E&C | Sep 2024 – Present | Jet Grouting / TAM Grouting (Inclined) |
| 6 | Contract N115 Design and Construction of North-South Corridor (Viaduct) Between Woodlands Ave 10 and Admiralty Road West |
Land Transport Authority (LTA) | Hyundai E&C | Feb 2024 – Present | Curtain Grouting (Inclined) |
| 7 | Contract N102 Design and Construction of North South Corridor(Tunnel) Between Victoria Street And Kampong Java Road |
Land Transport Authority (LTA) | Ssangyong – Wai Fong JV | Sep 2022 – Present | Deep Soil Mixing / Jet Grouting / Base Grouting / TAM Grouting / Fissure Grouting |
| 8 | Contract J109 Design and Construction of Toh Guan Station, Jurong Town Hall Station, Pandan Reservoir Station and Viaduct for Jurong Region Line |
Land Transport Authority (LTA) | Daewoo E&C | Aug 2022 – Present | Deep Soil Mixing |
| 9 | Contract N107 Design and Construction of North-South Corridor (Tunnel) Between Toa Payoh Rise and Marymount Lane |
Land Transport Authority (LTA) | Samsung C&T | From Sep 2019 to present | Jet Grouting, TAM Grouting, Fissure Grouting |
| 10 | Contract N106 Design and Construction of North-South Corridor (Tunnel) Between Novena Rise and Toa Payoh Rise |
Land Transport Authority (LTA) | Samsung C&T | From Apr 2019 to present | Jet Grouting (Triple Fluid Tube), TAM Grouting, Fissure Grouting |
| 11 | Contract N101 Design and Construction of North-South Corridor (Tunnel) Between ECP and Victoria Street |
Land Transport Authority (LTA) | GS E&C | From Apr 2019 to present | Jet Grouting, Recharge & Relief Well |
| 12 | Contract C885 Construction of Prince Edward Station and Tunnels for Circle Line 6 |
Land Transport Authority (LTA) | China Railway Tunnel Group | From Jul 2018 to present | Deep Soil Mixing, Jet Grouting, TAM Grouting, Fissure Grouting |
| 13 | Contract T301 Construction of 4-IN-1 Rail and Bus Depot and Reception Tunnels for Thomson-East Coast Line |
Land Transport Authority (LTA) | GS E&C | From Sep 2016 to present | Jet Grouting |
| 14 | Contract T216 Construction of Stevens Station and Tunnels for Thomson-East Coast Line |
Land Transport Authority (LTA) | Daewoo E&C | From Nov 2014 to present | Deep Soil Mixing, Grout Mix Pile, Micro Pile, Jet Grouting, TAM Grouting, Fissure Grouting, Recharge & Relief Well |
| 15 | Contract T307 Construction of Marine Parade Station and Tunnels for Thomson-East Coast Line |
Land Transport Authority (LTA) | Samsung C&T | From Nov 2018 to Oct 2019 | TAM Grouting |
| 16 | Contract C821A Construction of Kim Chuan Depot Extension for Cicle Line 6 |
Land Transport Authority (LTA) | Woh Hup Pte Ltd | From Feb 2019 to May 2019 | Jet Grouting |
| 17 | Contract NS2 Design, Construction and Completion of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | SK E&C | From Apr 2018 to Oct 2018 | Micro Pile |
| 18 | Contract NS1 Design & Construction of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | Samsung C&T | From Jan 2018 to Mar 2018 | Jet Grouting |
| 19 | Contract NS2 Design, Construction and Completion of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | SK E&C | From Jun 2017 to Dec 2017 | Jet Grouting |
| 20 | Contract T222 Construction of Outram Park Station and Tunnels for Thomson-East Coast Line |
Land Transport Authority (LTA) | Daelim Industrial | From Feb 2017 to May 2017 | Micro Pile |
| 21 | Contract T215 Construction of Mount Pleasant Station and Tunnels for Thomson-East Coast Line |
Land Transport Authority (LTA) | RSEA-Eng Lee-Wai Fong J.V | From Sep 2015 to Dec 2015 | TAM Grouting |
| 22 | Contract NS2 Design, Construction and Completion of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | SK E&C | From Aug 2015 to Jan 2017 | Fissure Grouting, Micro Pile |
| 23 | Contract T221 Construction of Havelock Station for Thomson-East Line |
Land Transport Authority (LTA) | Gammon Construction | From Apr 2015 to Sep 2015 | Fissure Grouting |
| 24 | Contract C913 Desgin & Construction for Hillview and Cashew Station and Tunnel |
Land Transport Authority (LTA) | GS E&C | From Feb 2014 to May 2014 | Jet Grouting |
| 25 | Contract EW2 Design, Construction and Completion of East-West Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | SK E&C | From Dec 2013 to Feb 2017 | Jet Grouting, TAM Grouting, Fissure Grouting, Pipe Roof, Recharge Well |
| 26 | Contract C918 Desgin & Construction of Tan Kah Kee Station and Tunnels |
Land Transport Authority (LTA) | SK E&C | From Dec 2013 to Jul 2014 | Fissure Grouting |
| 27 | Contract PP1A Construction of Service Tunnels, Access Shaft |
JTC Corporation | Hyundai E&C | From Oct 2013 to Jun 2015 | Jet Grouting |
| 28 | Contract NS2 Design, Construction and Completion of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | SK E&C | From Feb 2013 to Jun 2014 | Fissure Grouting |
| 29 | Contract NS1 Design & Construction of North-South Transmission Cable Tunnel |
Singapore PowerGrid (SPPG) | Samsung C&T | From Feb 2013 to Feb 2014 | Fissure Grouting, Pipe Roof |
| 30 | Contract C931 Design & Construction of MacPherson Station |
Land Transport Authority (LTA) | Hyundai E&C | From Dec 2012 to Jul 2014 | Jet Grouting |
| 31 | Contract C486 Marina Coastal Expressway (Marina East) |
Land Transport Authority (LTA) | Samsung C&T | From Aug 2012 to Jan 2013 | Jet Grouting, Micro Pile |
| 32 | Contract C485 Marina Coastal Expressway (Marina Bay Crossing) |
Land Transport Authority (LTA) | Penta-Ocean | From Jun 2012 to Sep 2012 | Jet Grouting |
| 33 | Contract C915 Design & Construction of Tunnels Between Stations at Beauty World and Hilview |
Land Transport Authority (LTA) | SK E&C | From Sep 2011 to Feb 2012 | Jet Grouting |
| 34 | Contract C156 North-South Line Extension (NSLE) |
Land Transport Authority (LTA) | Samsung C&T | From Apr 2011 to Jun 2011 | Deep Soil Mixing, Jet Grouting |
| 35 | Contract MC02 Proposed Common Services Tunnel at Marina Bay |
Land Transport Authority (LTA) | Singapore P&C | From Feb 2011 to Aug 2011 | Jet Grouting |
| 36 | Contract C483 Marina Coastal Expressway (Marina South ll) |
Land Transport Authority (LTA) | Samsung C&T | From Jan 2011 to Sep 2011 | Jet Grouting |
| 37 | Contract C482 Marina Coastal Expressway (Marina South l) |
Land Transport Authority (LTA) | Ssangyong E&C | From Jul 2010 to Oct 2010 | Jet Grouting |
| 38 | Contract C487 Marina Coastal Expressway (ECP/KPE Interchange) |
Land Transport Authority (LTA) | Daelim Industrial | From Mar 2009 to Jul 2013 | Deep Soil Mixing, Soil Mixing Wall, Jet Grouting, TAM Grouting |