Contract C156
North-South Line Extension (NSLE)
| Client | : Land Transport Authority (LTA) |
| Main Contractor | : Samsung C&T |
| Construction Method | : Deep Soil Mixing (DSM) |
| Client | : Land Transport Authority (LTA) |
| Main Contractor | : Samsung C&T |
| Construction Method | : Deep Soil Mixing (DSM) |